Full Plumbing Takeoff for a 15-Story Hotel with Indoor Pool & Restaurant

Our expertise combines visionary design with practical execution, ensuring functional, beautiful spaces that meet the demands of modern life and exceed expectations.

about project

Horizon Hospitality Builders was preparing a bid for a 15-story, 210-room hotel featuring an indoor pool, commercial kitchen, laundry facility, bar, meeting rooms, and rooftop mechanical equipment. Due to the complexity of the plumbing systems and the fast-approaching bid deadline, the client required a full plumbing takeoff with system-by-system cost breakdowns.

Project Scope

The project included:

  • Domestic hot and cold water distribution
  • Hot water recirculation system
  • Sanitary and vent systems for 210 guest bathrooms
  • Pool plumbing systems, including filters, pumps, and drainage
  • Commercial kitchen plumbing, grease interceptors, and floor drains
  • Roof and balcony storm drainage
  • Laundry and back-of-house plumbing

Natural gas piping for kitchen equipment and boilers

Client Requirements

The client asked for:

  • A detailed material and labor estimate ready for immediate bid use
  • Separate cost sections for hotel rooms, commercial kitchen, pool systems, and back-of-house areas
  • Precise fixture count verification across 15 repetitive floors
  • Quick turnaround without compromising accuracy

Value-engineering suggestions to improve bid competitiveness

Challenges

  • Over 470 sheets of drawings requiring extensive coordination
  • Repetitive floors with varying bathroom layouts across guest wings
  • Complex routing for hot water recirculation
  • Tight 72-hour delivery requirement
  • Significant variation between architectural and plumbing schedules
  • High-detail kitchen and pool systems needing specialized calculations

Drawing Review & Coordination

We conducted:

  • A full audit of architectural, plumbing, mechanical, structural, and civil plans
  • Confirmation of fixture layouts and pipe routes across 15 floors
  • Verification of commercial kitchen equipment rough-ins
  • Coordination of pool mechanical systems and filtration loops
  • Review of envelope penetrations, sleeves, and firestopping
  • Comparison of drawing revisions to eliminate discrepancies

Our Approach

1. Digital Quantity Takeoff

Using PlanSwift + Bluebeam, we extracted precise quantities for:

  • PEX/Copper/CPVC domestic water piping
  • PVC/ABS sanitary and vent systems
  • Gas piping with BTU load calculations
  • Hot water recirculation mains and branches
  • Floor drains, cleanouts, carrier systems
  • Pool supply, return, and drain piping
  • Roof drains, scuppers, leaders, and storm piping

     

2. Pipe Sizing & Calculations

  • Applied fixture-unit calculations per the Florida Plumbing Code
  • Determined recirculation pump requirements
  • Verified sanitary stack capacities and vent sizing
  • Calculated grease interceptor capacities for the commercial kitchen
  • Checked storm loads for roof and balcony drains

3. Labor Productivity & Cost Building

  • Estimated labor hours using hotel-specific production rates
  • Accounted for vertical installation challenges across 15 floors
  • Included equipment (lifts, scaffolding, material hoists)
  • Built complete material + labor assemblies for each system
  • Provided a floor-by-floor, system-by-system cost summary

4. Quality Control

  • Double-review process
  • Automated clash detection for shafts and risers
  • Manual verification of bathroom stacks and kitchen rough-ins
  • Reconciliation of fixture counts across all drawing sets

5. Final Deliverable

We delivered a 182-page detailed plumbing estimate, including:

  • System-level cost breakdowns
  • Floor-by-floor fixture summaries
  • Separate estimates for pool, kitchen, and laundry
  • Value-engineering options (material substitutions, routing optimization)

Delivered within 72 hours, exceeding client expectations.

Results

  • Client submitted a highly competitive bid supported by accurate numbers
  • Their internal estimating team saved over 60 hours of work
  • Our early detection of vent stack conflicts prevented potential redesign costs
  • Procurement planning improved thanks to clear material summaries

Final plumbing contract value was within 2.8% of our estimate

Project Preview

Horizon Hospitality Builders
High-Rise Hotel (New Construction)
Orlando, Florida, USA
Complete Plumbing Takeoff, Pipe Sizing Verification & Cost Estimation
Building, Interior

Don’t hesitate to contact us

Call us
+1(469) 638 3584
Email us
info@plumbingcostestimator.com
Chat with us
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare